three‐layer sheeting (company: doka) was placed on the base structure, following the specified inclinations [...] wide) were placed on that framework, providing the base layer for the dam structure and a sealing foil. [...] basin was adapted during the project. Figure 2: Base framework of the model (Iliadis, 2015). 11 Figure