As part of the development of the mobile construction site robot, a pilot project was carried out in the railway tunnel between Styria and Carinthia (Austria). The holes for mounting the technical tunnel equipment were drilled into the tunnel wall. A distance of 25 km had to be covered from the tunnel portal to the test construction site … no problem with an e-bike!